HS Softball Field

  • The Hamburg Area High School Softball Field was initially constructed with the 1974 renovation of the High School.  Dugouts, a new backstop and a batting cage were added following the 2006 season. Fences were installed in front of each dugout and extending down each foul line following the 2007 season.  Also in 2007, spectator bleachers were added along the home and visitor foul lines.  During the summer of 2010, (2) practice pitching areas were installed, the pitcher's mound was reconstructed and an 8' x 3' Nevco 1550 wireless scoreboard was installed in left-center field.